EHEIM

Lot of 5 - OMEGA Miniature Type K Male Connector, 120” Long Lead, 20 AWG (.032")

Description: New, but have some markings on them on one side of the connector (see pictures). 5 pieces as pictured. Each one has 10 ft. leads 20 AWG (0.032")

Price: 34.99 USD

Location: Albuquerque, New Mexico

End Time: 2024-08-29T00:36:17.000Z

Shipping Cost: N/A USD

Product Images

Lot of 5 - OMEGA Miniature Type K Male Connector, 120” Long Lead, 20 AWG (.032")Lot of 5 - OMEGA Miniature Type K Male Connector, 120” Long Lead, 20 AWG (.032")Lot of 5 - OMEGA Miniature Type K Male Connector, 120” Long Lead, 20 AWG (.032")Lot of 5 - OMEGA Miniature Type K Male Connector, 120” Long Lead, 20 AWG (.032")Lot of 5 - OMEGA Miniature Type K Male Connector, 120” Long Lead, 20 AWG (.032")Lot of 5 - OMEGA Miniature Type K Male Connector, 120” Long Lead, 20 AWG (.032")Lot of 5 - OMEGA Miniature Type K Male Connector, 120” Long Lead, 20 AWG (.032")

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: OMEGA

Lead Length: 120"

MPN: Type K Male Mini Thermocouple

Thermocouple Type: K

Recommended

Omega XL 120 Capsules Green Lipped Mussel New Zealand Omega 3 - Exp 12/2026 New
Omega XL 120 Capsules Green Lipped Mussel New Zealand Omega 3 - Exp 12/2026 New

$29.00

View Details
Nordic Naturals Ultimate Omega - with EPA, DHA - Highest Potency, 3x Strength
Nordic Naturals Ultimate Omega - with EPA, DHA - Highest Potency, 3x Strength

$14.77

View Details
ZESTY PAWS Allergy Immune Supplement for Dogs - With Omega 3 Salmon Fish Oil &
ZESTY PAWS Allergy Immune Supplement for Dogs - With Omega 3 Salmon Fish Oil &

$18.00

View Details
Maximum Strength Triple Omega 3-6-9 Fish, Flax & Borage Oils-240 Softgels
Maximum Strength Triple Omega 3-6-9 Fish, Flax & Borage Oils-240 Softgels

$17.14

View Details
Omega XL 300 Capsules - Green Lipped Mussel New Zealand Omega 3 EXP: 08/2026
Omega XL 300 Capsules - Green Lipped Mussel New Zealand Omega 3 EXP: 08/2026

$44.99

View Details
Nature Made Organic  Flaxseed Oil 1400mg 700mg Omega 3, 300  Fast  Free Shipping
Nature Made Organic Flaxseed Oil 1400mg 700mg Omega 3, 300 Fast Free Shipping

$19.99

View Details
Omega x Swatch Snoopy Moonswatch Mission to the Moonphase New Moon New
Omega x Swatch Snoopy Moonswatch Mission to the Moonphase New Moon New

$269.66

View Details
Omega XL 120ct by Great HealthWorks Small, Potent,Joint Pain Relief, Omega-3 NEW
Omega XL 120ct by Great HealthWorks Small, Potent,Joint Pain Relief, Omega-3 NEW

$26.00

View Details
Omega XL 120ct by Great HealthWorks Small, Potent,Joint Pain Relief, Omega NEW
Omega XL 120ct by Great HealthWorks Small, Potent,Joint Pain Relief, Omega NEW

$34.94

View Details
Omega XL 120ct by Great HealthWorks Small, Potent,Joint Pain Relief, Omega-3 NEW
Omega XL 120ct by Great HealthWorks Small, Potent,Joint Pain Relief, Omega-3 NEW

$25.58

View Details